This project required an opening with a steel beam. We produced the design and calculations for the steel beam but as little of the masonry wall was to remain, Building Control needed calculations to test the stability of the remaining masonry wall panel. We produced full masonry structural calculations.

 

steel-beam-report-Ralph Keeble

 

Cavity wall with opening - Ralph Keeble